Should packs carry a supersedes link to the pack they replace, making the spec-anchored chain of custody explicit and queryable?
Should user-facing output adopt the field's words (spec, plan, tasks) alongside ours (pack, pack sections), or keep this system's vocabulary alone?
Machine-owned states stay, with field evidence as justification.
Because: Fowler documents AI-interpreted checklist failure; transitions move only through loom commands.
Packs gain a supersedes link; the superseded stage rides it.
Because: Complete packs are frozen reference; today a new pack points at nothing, so lineage dies.
The deliverable stage is machine-derived and checksum-verified, never owner-set.
Because: An owner-set stage duplicates derived truth and drifts; the two axes (record lifecycle, delivery progress) get two fields: status stays lifecycle, deliverable carries progress.
Stage vocabulary: drafted, planning, in_progress, blocked, awaiting_owner, in_review, delivered, superseded.
Because: One word one meaning; each stage is separable by action: blocked needs a re-plan or unblock, awaiting_owner needs verdicts, in_review needs the closing PASS.
Stories gain acceptance criteria (given/when/then scenarios, AC- ids, same shape as requirement scenarios). Story done is its ACs met by done tasks: direct, owner-authored, machine-verified. Requirement scenarios stay for capability verification. Tasks accept ACs wherever they live; each AC keeps exactly one parent.
Because: Atlassian 3 C's: Confirmation (the AC) defines when the story is complete; the story and its AC are one unit. ACs are intent-altitude, requirement scenarios are solution-altitude. Owner direction with source, 2026-10-09.
The spec section anatomy is: why, stories (title, as/want/so, priority, independent_test, acceptance as given/when/then), edge_cases, requirements (plain MUST, serves a story, no scenarios), success_criteria, constraints, questions, assumptions, out_of_scope. Story done = its ACs met by done tasks.
Because: Three primary sources agree on the load-bearing parts: ACs live on the story (Atlassian 3 C's Confirmation; Spec Kit Acceptance Scenarios verbatim in templates/spec-template.md), priority and independent testability live on the story with the P1-alone-is-MVP rule (Spec Kit), requirements are plain MUST statements (Spec Kit FR-NNN, Kiro EARS), and success criteria and assumptions are spec-level sections we lack. Owner directive 2026-10-09: the spec, high level, codified.